Sector 07 — Data Centres

High-density load.
PUE is the whole game.

PPA structuring, renewable guarantees of origin, PUE optimisation and grid capacity strategy for the densest loads in the country.

Procurement at industrial scale

A data centre is, from an energy perspective, an industrial process with a near-flat load factor. That makes it the ideal candidate for structured, long-dated procurement — corporate PPAs, sleeved renewables, and genuinely additive REGO-backed supply rather than certificate window-dressing.

On the demand side, PUE improvement is engineering, not advice. We model cooling strategy, airflow containment and set-point discipline against the capex required and the carbon claimed.

Opportunities

+ What we typically find
  • REGO sourcing with no additionality behind the claim
  • Corporate PPA opportunities never modelled
  • Cooling set points conservative by 2–3 degrees
  • Containment and airflow losses driving PUE up
  • Grid capacity headroom constraining expansion plans
How we help

The four pillars,
applied to your estate.

Know your
numbers.

A 60-minute call. We will come prepared with a view on your portfolio before we arrive.

Or reach us directly  hello@taurusenergy.co.uk·07800 762 999