Every number below is measured against a stated baseline. Where we cannot verify a saving, we do not claim it.

Taurus restructured a £4.2M procurement portfolio across 87 sites. Inside 14 months, our weighted-average unit rate fell 17.4% against benchmark — and our finance director sleeps at night because she gets a position report on the 5th of every month.

Group Head of Procurement
Multi-site UK retail group · 87 sites · 56 GWh annual

Selected engagements

Detailed case studies are available under NDA. Below is a summary of representative mandates.

  • Multi-site retail, 87 sites, 56 GWh — flexible procurement restructure. Weighted-average unit rate down 17.4% vs benchmark over 14 months.
  • Food manufacturer, 6 plants — refrigeration and compressed air programme. 21% reduction in electricity consumption within 18 months, verified to IPMVP.
  • NHS trust estate — framework benchmarking and CHP spark-spread review. Annual saving equivalent to 4.1% of total energy spend.
  • Logistics operator, 22 depots — fleet electrification demand modelling. Two grid reinforcements avoided through on-site generation and charge scheduling.

See the
detail.

Full case studies, with methodology and baselines, are available on request.