High-density load.
PUE is the whole game.
PPA structuring, renewable guarantees of origin, PUE optimisation and grid capacity strategy for the densest loads in the country.
Procurement at industrial scale
A data centre is, from an energy perspective, an industrial process with a near-flat load factor. That makes it the ideal candidate for structured, long-dated procurement — corporate PPAs, sleeved renewables, and genuinely additive REGO-backed supply rather than certificate window-dressing.
On the demand side, PUE improvement is engineering, not advice. We model cooling strategy, airflow containment and set-point discipline against the capex required and the carbon claimed.
Opportunities
- REGO sourcing with no additionality behind the claim
- Corporate PPA opportunities never modelled
- Cooling set points conservative by 2–3 degrees
- Containment and airflow losses driving PUE up
- Grid capacity headroom constraining expansion plans
The four pillars,
applied to your estate.
Know your
numbers.