Cold chain, depots and
fleet electrification.
Depot demand profiling, cold chain optimisation, and EV infrastructure planning before the grid connection becomes the constraint.
The grid connection is the bottleneck
Fleet electrification turns a depot from a modest load into a substation-scale one. The planning horizon for a grid connection upgrade is measured in years, not months — which means the energy strategy has to run ahead of the fleet strategy, not behind it.
We model depot-by-depot demand under electrification scenarios, identify where on-site generation and storage defer or avoid a reinforcement, and structure the procurement around a demand curve that is about to change shape.
Opportunities
- Refrigeration set points and defrost cycles unoptimised
- Grid capacity headroom unknown at depot level
- Charging schedules that collide with peak pricing
- Solar and battery cases never modelled against reinforcement cost
- Cold store insulation and door discipline losses
The four pillars,
applied to your estate.
Know your
numbers.
A 60-minute call. We will come prepared with a view on your portfolio before we arrive.
Or reach us directly hello@taurusenergy.co.uk·07800 762 999